20 March 2013

REQUIREMENT 010 / 2013 // SEMI REFRIGERATE LPG CARRIER // TIME CHARTER

1,25 HERE



DEAR SIRS,
OUR CLOSE /DIRECT CHRTRS PDVSA IS IN THE MARKET FOR THE FOLLOWING TIME CHARTER REQUIREMENT:

VESSEL TYPE:

 SEMI REF LPG CARRIER

PERIOD:

1 YEAR

PRODUCTS:

PROPANE, BUTANE AND ISO-BUTANE

RESTRICTIONS:

(i)                 MIN DWT: 20.000 MT
(ii)  MAX DWT: 26.000 MT
(iii) MIN TWO (2) DOUBLE VALVE SEGREGATIONS
(iv)  MUST BE DOUBLE HULLED

(ii)               - PREFERABLE THAT THE SHIP CAN HANDLE THREE (03) DIFFERENT TEMPERATURE OF THE SEGREGATIONS TO BE LOADED.

REMARKS:

(i) VESSEL MUST BE ABLE TO LOAD 140 kb  OF PROPANE WITH A FRESH WATER DRAFT LOWER THAN 9 METERS (Maracaibo Lake restriction)
(ii) VESSEL MUST BE DELIVERED UNDER LPG VAPOURS
(iii) VESSEL SHOULD BE ABLE TO LIFT TWO GRADES SIMULTANEOUSLY  
(iv) VESSEL MUST CARRIE ON BOARD ALL REDUCTIONS USED IN VENEZUELAN PORTS (i.e. 6 in, 8 in and 10 in)

FLAG:

VENEZUELAN (PREFERABLE)

DELIVERY:

Venezuelan Ports, Caribbean.

REDELIVERY PORT:

Venezuelan Ports, Caribbean, US Gulf.

LAYCAN:

15- 30/ march/ 20123

OFFERS WILL BE VALID UNTIL:

April  12, 2013 @ 1700 CCS TIME

CHARTER PARTY:

PDVSA Time 2006 (MANDATORY)



 Note: OFFER MUST include the following info (As Applicable):
            1)        IMO and LR Number
            2)        Owner Information
            3)        Majors Approvals
            4)        Form C
            5)        Vessel Q88
            6)        Vessel particulars questionnaire (VPQ)

            Please inform the speed and consumption of IFO and MDO:
            1)        Loading
            2)        Loading / Deballasting
            3)        Discharging
            4)        Discharging / Ballasting
            5)        Sailing (in Ballast)
            6)        Sailing (laden)

Vessel will be subject to: management / terminals approvals and SCAT inspection.
VENEZUELAN INCOME TAX, MAX 1.7 % FOR OWNERS ACCOUNT.

Remarks:
* IN CASE SUBSTITUTE LPG/CARRIER, PLEASE INFORM THE NAME IN THE OFFER.
.- THE OFFER MUST BE SUBMITTED WITH ALL OF THE ABOVE REQUIRED INFORMATION.


***OFFERS WILL BE RECEIVED FRON NOW UNTIL 01/04/ 2013 13:00 HOURS CARACAS TIME**
***OFFERS RECEIVED AFTER THE DEADLINE WILL BE REJECTED.*******